In water distribution networks (WDNs), pressure limitation represents an effective strategy to reduce water losses. This goal can be achieved by means of pressure reducing valves (PRVs), which dissipate exceeding hydraulic energy. For a more sustainable management of water systems in a circular economy framework, PRVs can be replaced with energy-producing devices, such as pumps as turbines (PATs). This study presents a general approach for the selection of the optimal PAT to install in a given WDN. The approach assesses the techno-economic feasibility of a fleet of turbomachines, by evaluating the rate of energy recovery, the levelized cost of electricity and the payback period of each PAT. Two PAT regulation strategies are accounted for, namely hydraulic and electrical regulations. The approach is applied to a real-world case study, consisting of a WDN in Northern Italy that supplies around 5,000 users. In addition, a fleet of sixteen turbomachines is considered, of which the experimental characteristic curves are available in both pump and turbine modes. The analyses carried out in this paper allow selecting the optimal PAT to install within the considered WDN, which recovers 44.1 % of the hydraulic energy of the network with a maximum investment cost of € 24,500.

Hydraulic and electrical regulations of pumps as turbines for energy recovery in water distribution networks: Energy and economic analysis

Manservigi L.
;
Marsili V.;Mazzoni F.;Castorino G. A. M.;Farsoni S.;Losi E.;Alvisi S.;Franchini M.;Spina P. R.;Venturini M.
2025

Abstract

In water distribution networks (WDNs), pressure limitation represents an effective strategy to reduce water losses. This goal can be achieved by means of pressure reducing valves (PRVs), which dissipate exceeding hydraulic energy. For a more sustainable management of water systems in a circular economy framework, PRVs can be replaced with energy-producing devices, such as pumps as turbines (PATs). This study presents a general approach for the selection of the optimal PAT to install in a given WDN. The approach assesses the techno-economic feasibility of a fleet of turbomachines, by evaluating the rate of energy recovery, the levelized cost of electricity and the payback period of each PAT. Two PAT regulation strategies are accounted for, namely hydraulic and electrical regulations. The approach is applied to a real-world case study, consisting of a WDN in Northern Italy that supplies around 5,000 users. In addition, a fleet of sixteen turbomachines is considered, of which the experimental characteristic curves are available in both pump and turbine modes. The analyses carried out in this paper allow selecting the optimal PAT to install within the considered WDN, which recovers 44.1 % of the hydraulic energy of the network with a maximum investment cost of € 24,500.
2025
Manservigi, L.; Marsili, V.; Mazzoni, F.; Castorino, G. A. M.; Farsoni, S.; Losi, E.; Alvisi, S.; Bonfè, M.; Franchini, M.; Spina, P. R.; Venturini, M...espandi
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in SFERA sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11392/2607811
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact