The ALPI linear accelerator, as part of the SPES facility, should be upgraded. The main goal of the ALPI upgrade is increasing the ALPI energy to 10 MeV/A. In order to proceed the upgrade, two additional cryostats should be implemented in ALPI linac high-β section. In the framework of the ALPI Upgrade for the SPES facility production and cryostat measurements of the Nb/Cu, high-β QWR cavities was continued.
Production and Cryostat Measurements of the high-β Nb/Cu QWR cavities for the ALPI Upgrade of the SPES Facility
A. Tsymbaliuk
Primo
;
2021
Abstract
The ALPI linear accelerator, as part of the SPES facility, should be upgraded. The main goal of the ALPI upgrade is increasing the ALPI energy to 10 MeV/A. In order to proceed the upgrade, two additional cryostats should be implemented in ALPI linac high-β section. In the framework of the ALPI Upgrade for the SPES facility production and cryostat measurements of the Nb/Cu, high-β QWR cavities was continued.File in questo prodotto:
Non ci sono file associati a questo prodotto.
I documenti in SFERA sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.